...
.Nscale Locks $3.5 Billion Figure Robotics Compute Deal  ·Qatar’s Meeza Lands Major Hyperscaler Deal for 8MW ·Qualcomm Strikes Amazon AI Chip Deal, Opens Door to $4 Billion Stock ·Hitachi Energy Bets $300M on China Grid Manufacturing Corvex Builds Toward 8MW Cloud Infrastructure Footprint LITEON Bets $176 Million on DCX Liquid Cooling EdgeConneX Backs Singapore’s AI-Ready Tropical Data Center Testbed
.Nscale Locks $3.5 Billion Figure Robotics Compute Deal  ·Qatar’s Meeza Lands Major Hyperscaler Deal for 8MW ·Qualcomm Strikes Amazon AI Chip Deal, Opens Door to $4 Billion Stock ·Hitachi Energy Bets $300M on China Grid Manufacturing Corvex Builds Toward 8MW Cloud Infrastructure Footprint LITEON Bets $176 Million on DCX Liquid Cooling EdgeConneX Backs Singapore’s AI-Ready Tropical Data Center Testbed

Europe

The EU AI Act, grid constraints, Nordic green power, and sovereign cloud —
Europe is regulating and building digital infrastructure at the same time.
Articles
0
Markets
0
Committed
$ 0 B

Latest from Europe

142 Articles

AI Data Center Construction Faces a Cable Supply Bottleneck The global race to build artificial intelligence infrastructure is encountering another

Target Latin America’s infrastructure decision-makers with precision

Region-specific placement · computeforecast.com/advertise

Articles on europe

Long Reads

88 deep investigations & features

Why Electricity Reporting Cannot Tell the Whole Sustainability Story A data center can improve its

Introduction: The environmental cost of an AI result begins before training finishes An AI training

The deployment date can fail before the servers arrive A construction schedule can look healthy

Newsletters

Subscribe for the industry’s biggest infrastructure news

Weekly Digest

The week’s biggest infrastructure stories, every Monday.

Executive Forecast

Strategic analysis for CXOs, investors and operators, twice a month.

The GPU Hour

Compute pricing, availability and hardware — every Friday.

Power & Public

Energy, grid and policy shaping the AI buildout.

Regional Opinion

Data Center Rack Installation Logistics

Thermal Portability Is Becoming a Procurement Decision An AI server that performs well in one data center may struggle in

Scotland Data Center Inquiry

Scotland is confronting an unusual industrial question: how much infrastructure should a country prepare to accommodate before it knows how

Blue Coolant Pipes In A Data Center

A Capacity Commitment Is Only as Useful as Its Cooling Margin A data center contract can specify GPU quantities, power

AI Infrastructure Finland

The most consequential part of Finland’s decision involving Google’s planned data centers in Muhos and Kajaani is not the temporary

Economic Value

The most important number attached to a proposed data center may no longer be its megawatt capacity. It may be

AI Construction Capacity

Europe’s AI infrastructure debate increasingly centers on power, land, permitting and financing, but another constraint sits much closer to the

Practitioner Blogs

318 practitioner blogs

Europe’s next data center sites will depend on more than available land, fiber connectivity, and

A successful cooling system startup does not always mean the hardware is ready for sustained

A data center can occupy a relatively small physical footprint while creating an electricity requirement

Ireland’s experience with data-center expansion became less about stopping construction than about changing the terms

Industry Intelligence

46 reports & datasets

The next phase of data infrastructure will not be defined by how fast we build, but by how intelligently we

Article By: Louis Charlton, CEO, Global Commissioning For most of the data centre industry’s history, the substation was infrastructure that

The data center industry is scrambling to accommodate a wave of demand unlike anything we’ve seen before.  According to research

Scroll to Top
Seraphinite AcceleratorOptimized by Seraphinite Accelerator
Turns on site high speed to be attractive for people and search engines.